N0044430

Bridge traffic patterns to change in July

by Nicole Reitz

Motorists that live and drive through Fulton have undoubtedly noticed the construction and bump signs on the city’s bridges.

The Oneida Street Bridge is having joint repairs and the concrete deck is being sealed. According to Fulton DPW Commissioner Dan O’Brien, this is routine maintenance and the repairs and sealing of the concrete deck will be completed in two to three weeks.

There is also a temporary signal on West Second Street in the flasher mode. This signal is for construction purposes.

Message boards will be activated on West Broadway a week before the light goes into three-color mode.

Owned by the state, the Route 3 bridge construction project will be in full swing this summer. The project is what contractors call “fluid,” so dates listed are tentative. Message board signs, informing the public that there will be a change in traffic patterns, will be erected June 22.

To read the rest of the story, subscribe to The Valley News by calling 315-598-6397

Share this story:
Facebook Twitter Pinterest Plusone Email

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>